HOME >Performance result > Actual construction |
|
|
No. |
|
Completion date |
|
Construction title |
|
Client |
|
Capacity |
|
Location |
24 |
|
12.2015 |
|
Pilot Class(10TPD), Waste Biomass incinerator System Making |
|
CES Co., Ltd. |
|
10ton/day |
|
Inchoeon Metropolitan City |
23 |
|
11.2016 |
|
2nd Resource recovery facility waste heat boiler reprepair construction |
|
Saehan Environment Co., Ltd. |
|
48ton/day |
|
ChunAn, Kongki |
22 |
|
07.2016 |
|
High temperature incinerator facility making, Installation construction |
|
TOP Energy Solution Co., Ltd. |
|
62.4ton/day |
|
Hwaseong, Kyungki |
21 |
|
12.2015 |
|
Daegil Green Corp. Heat energy recovery facility construction |
|
Daegil Green Co., Ltd. |
|
156ton/day |
|
Inchoeon Metropolitan City |
20 |
|
11.2015 |
|
Waste energy incineration heat use facility making, erection construction. |
|
S&E Energy |
|
92.4ton/day |
|
Yangjoo, Kyungki |
19 |
|
06.2015 |
|
Combustiom furance and steam supply facility |
|
NRE Holdings Inc. |
|
51.1ton/day(#2) |
|
Asan, Chungnam |
18 |
|
04.2015 |
|
Gaesung waste facility(2nd) carry-in supply and incineration facility(RK incinerator) design, erection, installation cnstruction |
|
Hyundai Asan Inc. |
|
25ton/day |
|
Gaesung Industrial complex |
17 |
|
12.2014 |
|
Saehan Environment Corp. Waste energy incineration heat use facility making, erection(ESCO) |
|
Phoenix Co., Ltd. |
|
48ton/day |
|
CheongAn city Chungnam |
16 |
|
09.2014 |
|
Dongyang Environment Inc. Solid fuel incineration boiler facility installation energy saving business(ESCO) |
|
Peaco Inc. |
|
93.6ton/day |
|
SeoSan, ChungNam |
15 |
|
10.2013 |
|
Heating medium boiler erection and installation construction |
|
Samjung Pulp Co., Ltd. Pyung Taek plant |
|
3,800,000kcal/hr |
|
Pyung Taek, Kyungki |
14 |
|
10.2013 |
|
Incinerator #2 prevention facility changing construction |
|
Dongyang Environment Co.,Ltd. |
|
48 TON/DAY |
|
Deajeon |
13 |
|
10.2013 |
|
Incineration facility and prevention facility erectiom and installation construction |
|
Samjung Pulp Co., Ltd. |
|
- |
|
Susan, ChungNam |
12 |
|
08.2013 |
|
Waste heat recovery boiler erection and installation construction |
|
Mirae Paper Inc. |
|
6,500KG/HR |
|
JunJu, Chunbook |
11 |
|
08.2013 |
|
SeoKwang Hi-Tech Inc. Sludge dry facility installation construction |
|
Seokwang
Hi-tech Inc. |
|
Dryer 100ton/day |
|
Susan ChungNam |
10 |
|
09.2013 |
|
Thailand MSW pretreatment facility, incineration facility, and auxiliary facility design/ erection/ delivery/ installation |
|
Daerim stainless Inc..
Hyundai heavy industry Inc..
Dohwa Engineering Inc.. |
|
295 ton/day*
2 lot |
|
Thailand |
9 |
|
10.2012 |
|
Incinerator, Boiler(Vertical merge type, water tube 2Drum) and prevention facility design, erection, installation construction |
|
SamJung Pulp Co., Ltd. PyungTaek plant |
|
72ton/day |
|
PyungTaek, KyungKi |
8 |
|
06.2012 |
|
Incinerator maintenance and prevention facility erection and installation construction |
|
Serveone Inc. |
|
60ton/day |
|
Susan, ChungNam |
7 |
|
04.2012 |
|
Incinerator maintenance and Boiler( water tube type, 2 Drum), White smoke prevention facility design, erection, installation construction |
|
Bumwoo Inc. |
|
48ton/day |
|
Ulsan |
6 |
|
12.2011 |
|
Incinerator, Boiler (Vertical merge type, water tube type 2 Drum) and prevention facility design, erection, installation construction. |
|
Bumwoo Inc. |
|
72ton/day |
|
Ulsan |
5 |
|
10.2011 |
|
Incinerator maintenance and boiler (water tube type, 2 Drum) design, erection, installation construction |
|
Namkang Paper Inc. |
|
30ton/day |
|
Jinju, KyungNam |
4 |
|
03.2011 |
|
Incinerator, Boiler(Vertical merge type, water tube type 2 drum) design, erection, installation construction |
|
Dosi Environemnt Inc. |
|
24ton/day |
|
YunChun, KyungKi |
3 |
|
07.2010 |
|
Incinerator, boiler( Vertical merge type, water tube type 2 Drum) and prevention facility design, erection, installation construction |
|
Mirae Paper Inc. |
|
24ton/day |
|
JunJoo, JunBook |
2 |
|
04.2010 |
|
Rotary kiln maintenance works |
|
EG Inc. |
|
- |
|
Ulsan |
1 |
|
10.2009 |
|
High temperature Bag filter facility erection and installation construction |
|
EG Inc. |
|
- |
|
Ulsan |
|
|
1 |
|
|
|
|
|
|
|
|