Performance result

HOME >Performance result > Actual construction
 
Incinerator maintenance and Boiler( water tube type, 2 Drum), White smoke prevention facility design, erection, installation construction
Bumwoo Inc.
48ton/day
Ulsan
Bumwoo Inc.
09.2011
04.2012